塑膠球場施工中塑膠層起泡現(xiàn)象分析
關(guān)鍵詞: 塑膠球場施工中塑膠層起泡現(xiàn)象分析 發(fā)表時間:2017-01-21 瀏覽量:2478 來源:昆山展奧
塑膠材料是一種應(yīng)用非常普遍的材料,這種材料具有耐磨性好、彈性好、硬度適中、紙滑等優(yōu)點(diǎn)。因此在各大學(xué)校、運(yùn)動會田徑賽場跑道、球場等場所施工中得到廣泛應(yīng)用。是但前學(xué)校、體育場館非常常見的一種跑道及球場類型,這種跑道及球場類型,在實(shí)際施工過程中會遇到不少問題的,給整個跑道及球場施工質(zhì)量造成影響,嚴(yán)重情況下甚至?xí)θ松碓斐晌:ΑO旅婢退苣z球場施工過程中塑膠層起泡問題進(jìn)行分析:
Plastic material is a very common material, this material has good wear resistance, good elasticity, moderate hardness, paper slip and other advantages. Therefore, it has been widely used in the construction of track and field track and stadium in various universities and games. But before school, the stadium is one of the most common types of the stadium and the runway, the runway and the stadium, in the actual construction process will encounter many problems, the impact to the whole track and stadium construction quality, severe cases may even cause harm to the human body. The plastic layer on the plastic floor in the construction process of the analysis:
首先,塑膠球場施工中塑膠層氣泡,同基礎(chǔ)脫層。這一問題主要是出現(xiàn)在塑膠層做完之后不久,剛剛做完就出現(xiàn)局部或者大面積起鼓,嚴(yán)重情況下則是會出現(xiàn)同基礎(chǔ)脫離開來的問題。塑膠球場施工中這一問題的產(chǎn)生往往是由于水泥標(biāo)號不合格、隔水氣層不合格或者是地下水氣上升從而使得塑膠層頂起,使得塑膠層出現(xiàn)了起鼓現(xiàn)象。對于這樣一個問題應(yīng)該引起高度重視。起鼓現(xiàn)象的出現(xiàn)說明了在實(shí)際施工過程中時存在著一定問題的,塑膠球場施工方法和施工工藝有待調(diào)整。
First of all, plastic stadium construction of plastic layer bubble, the same layer off. This problem is mainly in the plastic layer done soon after, just finished on the local or a large area of the drum, in serious cases will appear with the foundation from the problem. The plastic pitch in the construction are often due to substandard cement grade and water resisting layer is not qualified or underground water vapor rise so that the plastic layer from the top end, so that the plastic layer appeared bulge. We should attach great importance to such a problem. The emergence of drum phenomenon shows that there are some problems in the actual construction process, the construction method and construction technology of plastic stadium need to be adjusted.
對于塑膠球施工中這種問題的處理,同起泡問題的處理方法基本類似。先是要割掉起泡部分,曬干之后再來進(jìn)行基礎(chǔ)防水處理。然后就是要根據(jù)要求來補(bǔ)平,然后要補(bǔ)色差。對于這種問題的預(yù)防主要是要做好基礎(chǔ)防水質(zhì)量關(guān)。PU塑膠鋪設(shè)過程中同樣是需要對空氣濕度以及基礎(chǔ)含水率來進(jìn)行嚴(yán)格控制。只有進(jìn)行嚴(yán)格控制才能夠真正滿足時間需要。
The treatment of this problem in plastic ball construction is similar to that of foaming process. The first is to cut off the foam part, again based water treatment and then dried in the sun. Then it is necessary to fill in accordance with the requirements, and finally to fill color. For the prevention of this problem is to do a good job of basic waterproof quality. PU Plastic laying process is also the need for air humidity and moisture content to strictly control. Only strict control can really meet the needs of time.
Plastic material is a very common material, this material has good wear resistance, good elasticity, moderate hardness, paper slip and other advantages. Therefore, it has been widely used in the construction of track and field track and stadium in various universities and games. But before school, the stadium is one of the most common types of the stadium and the runway, the runway and the stadium, in the actual construction process will encounter many problems, the impact to the whole track and stadium construction quality, severe cases may even cause harm to the human body. The plastic layer on the plastic floor in the construction process of the analysis:
首先,塑膠球場施工中塑膠層氣泡,同基礎(chǔ)脫層。這一問題主要是出現(xiàn)在塑膠層做完之后不久,剛剛做完就出現(xiàn)局部或者大面積起鼓,嚴(yán)重情況下則是會出現(xiàn)同基礎(chǔ)脫離開來的問題。塑膠球場施工中這一問題的產(chǎn)生往往是由于水泥標(biāo)號不合格、隔水氣層不合格或者是地下水氣上升從而使得塑膠層頂起,使得塑膠層出現(xiàn)了起鼓現(xiàn)象。對于這樣一個問題應(yīng)該引起高度重視。起鼓現(xiàn)象的出現(xiàn)說明了在實(shí)際施工過程中時存在著一定問題的,塑膠球場施工方法和施工工藝有待調(diào)整。
First of all, plastic stadium construction of plastic layer bubble, the same layer off. This problem is mainly in the plastic layer done soon after, just finished on the local or a large area of the drum, in serious cases will appear with the foundation from the problem. The plastic pitch in the construction are often due to substandard cement grade and water resisting layer is not qualified or underground water vapor rise so that the plastic layer from the top end, so that the plastic layer appeared bulge. We should attach great importance to such a problem. The emergence of drum phenomenon shows that there are some problems in the actual construction process, the construction method and construction technology of plastic stadium need to be adjusted.
對于塑膠球施工中這種問題的處理,同起泡問題的處理方法基本類似。先是要割掉起泡部分,曬干之后再來進(jìn)行基礎(chǔ)防水處理。然后就是要根據(jù)要求來補(bǔ)平,然后要補(bǔ)色差。對于這種問題的預(yù)防主要是要做好基礎(chǔ)防水質(zhì)量關(guān)。PU塑膠鋪設(shè)過程中同樣是需要對空氣濕度以及基礎(chǔ)含水率來進(jìn)行嚴(yán)格控制。只有進(jìn)行嚴(yán)格控制才能夠真正滿足時間需要。
The treatment of this problem in plastic ball construction is similar to that of foaming process. The first is to cut off the foam part, again based water treatment and then dried in the sun. Then it is necessary to fill in accordance with the requirements, and finally to fill color. For the prevention of this problem is to do a good job of basic waterproof quality. PU Plastic laying process is also the need for air humidity and moisture content to strictly control. Only strict control can really meet the needs of time.